WaterSet by connection chargeCitation Vacaville Municipal Code ch. 11.01; Resolution 2022-059

Water connection and installation fee

Levied by City of Vacaville on new development in Vacaville. Authorized under the Gov. Code Sec. 66013 (capacity charge for water or sewer service). Collected at building permit.

What one house pays

$13,757

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot — this fee varies by house size, so see the full schedule below.

Share of Vacaville's total
18%
Total one-time fees here
$76,152
Adjustment
Adjusts yearly · ENR construction cost index · January
what the document says

ENR SF Bay Area CCI annual

Next expected change
1 Jan 2027

The record

Why it exists

“These impact fee programs are intended to mitigate new development's impact on the need for new backbone infrastructure and public facilities and provide a mechanism by which new development contributes its 'fair-share' to construction of new facilities needed to accommodate growth.”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, ch. 1 "Background", study p. 1 · source document ↗
What it pays for

“Water Facility Fee – To provide for the expansion of production, storage, transmission, treatment, and distribution facilities in the water utility as specified in the City's Infrastructure Master Plans and Development Fee Program.”

City of Vacaville Development Impact Fee Report, Fiscal Year Ended June 30, 2025, "DESCRIPTION OF IMPACT FEES", report p. 7 · source document ↗
Where it applies

“Future development subject to the City's development impact fees will include all development within the existing City limits and Urban Growth Boundary (UGB), excluding development in the Northeast Area (DIF Boundary). The Northeast Growth Area (NE Growth Area) was excluded from the latest Development Impact Fee (DIF) update primarily because it remains conceptual and undeveloped”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, "Fee Program Applicability", study p. 10 · source document ↗
When it was adopted

“NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Vacaville adopt the Development Impact Fee Nexus Study and fee schedule, included in the nexus study, and approve the VDIF Program to fund improvements needed to accommodate future development, addressing impacts associated with future ... I HEREBY CERTIFY that the foregoing resolution was introduced and passed at a regular meeting of the City Council of the City of Vacaville, held on the 28th day of June 2022”

City of Vacaville, Agenda Item No. 9C, June 28, 2022, attached "RESOLUTION NO. 2022-", operative and certification clauses · source document ↗
Who adopted it

“NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Vacaville adopt the Development Impact Fee Nexus Study and fee schedule, included in the nexus study, and approve the VDIF Program to fund improvements needed to accommodate future development, addressing impacts associated with future ... I HEREBY CERTIFY that the foregoing resolution was introduced and passed at a regular meeting of the City Council of the City of Vacaville, held on the 28th day of June 2022”

City of Vacaville, Agenda Item No. 9C, June 28, 2022, attached "RESOLUTION NO. 2022-", operative and certification clauses · source document ↗
When it is paid

at building permit

“Development Impact Fees (DIF's) are paid by new development projects as a mechanism to mitigate impacts on public facilities and infrastructures created as a result of new development. These fees are typically collected at the time a building permit is issued.”

City of Vacaville Agenda Item No. 9G, December 9, 2025, "BACKGROUND" · source document ↗
Who collects it

City of Vacaville, the agency that levies it

“Separate and unique DIF funds have been established to manage and account for each of the following types of public facilities: Parks and Recreation, Greenbelt Preservation, General Facilities, Police, Fire, Traffic, Storm Drain Detention, Storm Drain Conveyance, Sewer Collection and Treatment, and Water Distribution and Storage.”

City of Vacaville Agenda Item No. 9G, December 9, 2025, "BACKGROUND" · source document ↗
Who is exempt

“WHEREAS, as part of a 2025 update to the City's ordinance implementing its Development Impact Fee program, a provision relating to an exemption from new impact fees for changes in nonresidential use of a building constructed prior to June 20, 1960 was inadvertently removed, and the City desires to replace this language in the current Chapter 11.01”

City of Vacaville Agenda Item No. 11B, March 10, 2026, attached omnibus ordinance, recitals · source document ↗
Credits and offsets

“Section 11.01.190 Credit for Previously Paid Fees — This section governs the process by which development project applicants may apply to the City's Community Development Director for certain types of development impact fee credits. The proposed revision is to re-incorporate language that was inadvertently removed as part of the City's most recent update to this section in 2025, relating to limitation of additional impact fees for changes in use affecting pre-1960 buildings within the City.”

City of Vacaville Agenda Item No. 11B, March 10, 2026, "DISCUSSION" · source document ↗
How it changes

“BE IT FURTHER RESOLVED that the updated residential fees will fully take effect on July 1, 2023; until that time, residential builders will have the option of paying the updated fees or the existing fees”

City of Vacaville, Agenda Item No. 9C, June 28, 2022, attached "RESOLUTION NO. 2022-", operative clauses · source document ↗

Every published rate

Land useHouse sizeBasisEffectiveAmount
—
Single-family detached largest sf tierunverified per DU 1 Jan 2026 $15,059
Single-family detached 2,000-2,999 sfthis home per DU 1 Jan 2025 $13,757

“Existing Fees (2025 Fee Schedule) [6] ... Water Connection & Installation [10] $13,757 $13,757 $9,861 $5,319 $5,319 $1,991" — column heading "Single Family (1,200 sq. ft.) [2]"; footnote "[10] Fees for development outside of DTSP. Assumes one 1-inch meter for single family residential units.”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, Table 2-3, study p. 9 — $13,757, band 1,000–1,999 sf · source document ↗
Single-family detached 1,000-1,999 sfthis home per DU 1 Jan 2025 $13,757

“Existing Fees (2025 Fee Schedule) [6] ... Water Connection & Installation [10] $13,757 $13,757 $9,861 $5,319 $5,319 $1,991" — column heading "Single Family (1,200 sq. ft.) [2]"; footnote "[10] Fees for development outside of DTSP. Assumes one 1-inch meter for single family residential units.”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, Table 2-3, study p. 9 — $13,757, band 1,000–1,999 sf · source document ↗
Single-family detached smallest sf tierunverified per DU 1 Jan 2026 $4,176
outside DTSP
Multi-family 970 sq ft per DU — $9,861
the line this rate was read from

“Existing Fees (2025 Fee Schedule) [6] ... Water Connection & Installation [10] $13,757 $13,757 $9,861 $5,319 $5,319 $1,991" — third column heading "Multifamily (970 sq. ft.) [3]"; footnote "[3] Assumes a 970 square foot, 2-bedroom apartment within a 200 units apartment development on 10 acres (20 DU/Acre)." and footnote "[10] ... Assumes one 2-inch meter for every 20 multi-family units.”

the levying document · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.