Sewer - collectionSet by connection chargeCitation Vacaville Municipal Code ch. 11.01; Resolution 2022-059

Sewer capacity fee

Levied by City of Vacaville on new development in Vacaville. Authorized under the Gov. Code Sec. 66013 (capacity charge for water or sewer service). Collected at building permit.

What one house pays

$10,865

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot — this fee varies by house size, so see the full schedule below.

Share of Vacaville's total
14%
Total one-time fees here
$76,152
Adjustment
Adjusts yearly · ENR construction cost index · January
what the document says

ENR SF Bay Area CCI annual

Next expected change
1 Jan 2027

The record

Why it exists

“Sewer Facility Fee – To provide for the expansion of collection and treatment capacities in the wastewater utility as specified in the City's Infrastructure Master Plan and Development Fee Program.”

City of Vacaville Development Impact Fee Report, Fiscal Year Ended June 30, 2025, "DESCRIPTION OF IMPACT FEES", p. 7 · source document ↗
What it pays for

“BWA used a "buy-in and expansion" methodology to establish new maximum sewer and water capacity fees on a per Equivalent Dwelling Unit (EDU) basis. Under this approach, new connections buy in for a proportionate share of existing facilities and pay for their fair share of expansion-related improvements to meet the capacity needs of new growth.”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, ch. 13 "Water and Sewer Capacity Fees", p. 89 · source document ↗
Where it applies

“Future development subject to the City's development impact fees will include all development within the existing City limits and Urban Growth Boundary (UGB), excluding development in the Northeast Area (DIF Boundary).”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, ch. 2 "Fee Program Applicability", p. 10 · source document ↗
When it was adopted

1992 (programme); current schedule adopted 2022-06-28

“The City of Vacaville (City) collects a variety of development impact fees from new development projects in the City. ... First comprehensively updated in 1992, following the City's 1990 General Plan, the City's current fee program was updated in 2022 and includes the following components: ... Sewer Capacity Fee”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, ch. 1 "Background and Legal Context", p. 1 · source document ↗
Who adopted it

“The City of Vacaville (City) collects a variety of development impact fees from new development projects in the City. ... First comprehensively updated in 1992, following the City's 1990 General Plan, the City's current fee program was updated in 2022 and includes the following components: ... Sewer Capacity Fee”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, ch. 1 "Background and Legal Context", p. 1 · source document ↗
When it is paid

at building permit

“Development Impact Fees (DIF's) are paid by new development projects as a mechanism to mitigate impacts on public facilities and infrastructures created as a result of new development. These fees are typically collected at the time a building permit is issued.”

Agenda Item No. 9G, December 9, 2025, "CITY OF VACAVILLE FISCAL YEAR 2024-2025 DEVELOPMENT IMPACT FEE REPORT", BACKGROUND · source document ↗
Who collects it

City of Vacaville, the agency that levies it

“Separate and unique DIF funds have been established to manage and account for each of the following types of public facilities: Parks and Recreation, Greenbelt Preservation, General Facilities, Police, Fire, Traffic, Storm Drain Detention, Storm Drain Conveyance, Sewer Collection and Treatment, and Water Distribution and Storage. Interest on each DIF fund is credited to that fund or account and used only for those purposes for which the fees were collected.”

Agenda Item No. 9G, December 9, 2025, BACKGROUND · source document ↗
Who is exempt

“Single family size ranges established based on differences in estimated persons per household. There is an impact fee exemption from accessory dwelling units (ADUs) under 750 sf. ADUs above 750 sf pay fees based on the proportion of the square footage of the ADU to the square footage of the primary dwelling unit. Senior-restricted units have lower traffic fee based on their low trip reduction.”

Agenda Item No. 9C, June 28, 2022, Table 3 / Table 1-3 "Summary of Updated Residential Development Impact Fees by Size/Type", footnote [2] · source document ↗
Credits and offsets

“The City's Municipal Code, Chapter 11.01 addresses development impact fees and describes many of the key policies and procedures for fee administration and implementation, including impact fee funds, impact fee adjustments, and impact fee credits and reimbursements, among others.”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, ch. 14 "Administration and Implementation", p. 94 · source document ↗
How it changes

“BE IT FURTHER RESOLVED that the updated residential fees will fully take effect on July 1, 2023; until that time, residential builders will have the option of paying the updated fees or the existing fees; and BE IT FURTHER RESOLVED that the updated nonresidential fees will be phased in over three years; beginning on July 1, 2023, the fees will increase by 1/3, and with each subsequent July, the fees will go up 1/3 until the updated fees are fully in effect beginning July 1, 2025”

Resolution No. 2022-___, adopted June 28, 2022, operative clauses · source document ↗

Every published rate

Land useHouse sizeBasisEffectiveAmount
—
Single-family detached 2,000-2,999 sfthis home per DU 1 Jan 2025 $10,865

“Sewer Capacity [9] $10,865 $9,054 $7,243 $4,527 $2,716 $905" under the section heading "Existing Fees (2025 Fee Schedule) [6]" and the column headings "Item | Single Family (2,500 sq. ft.) [1] | Single Family (1,200 sq. ft.) [2] | Multifamily (970 sq. ft.) [3] | Commercial [4] | Office [4] | Industrial [5]", with the units band "-----per unit-----" over the first three and "-----per 1,000 sf-----" over the last three; footnote "[1] Assumes a 2,500 square foot, 4-bedroom single family home."; footnote "[9] Fees for development outside of DTSP." — the $10,865 is the Single Family (2,500 sq. ft.) column, which Table 2-2 footnote [3] places "in the 2,000 to 2,999 square foot size range”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, Table 2-3, p. 9 · source document ↗
Single-family detached 1,000-1,999 sf per DU 1 Jan 2025 $9,054
the line this rate was read from

“The updated Sewer Capacity Fee is $10,433 per EDU for development outside the DTSPB and $8,737 per EDU for development outside the DTSPB. The 2025 Sewer Capacity Fee was $7,322 (inside) to $9,054 (outside) per EDU. In order to maintain consistency with the existing definition of an EDU for sewer fee purposes, a sewer EDU is defined as a single-family unit in the 1,000 to 1,999 square foot range.”

2025 Vacaville Development Impact Fees Nexus Study, December 9, 2025, ch. 13 "Sewer Capacity Fees", p. 90 · source document ↗
Single-family detached largest sf tierunverified per DU 1 Jan 2026 $1,789
Single-family detached smallest sf tierunverified per DU 1 Jan 2026 $497.00
outside DTSP
Multi-family 970 sq. ft. (Multifamily prototype column) per DU — $7,243
the line this rate was read from

“Sewer Capacity [9] $10,865 $9,054 $7,243 $4,527 $2,716 $905", the third figure falling under the column heading "Multifamily (970 sq. ft.) [3]" in the units band "-----per unit-----", section "Existing Fees (2025 Fee Schedule) [6]"; footnote "[3] Assumes a 970 square foot, 2-bedroom apartment within a 200 units apartment development on 10 acres (20 DU/Acre)."; footnote "[9] Fees for development outside of DTSP.”

the levying document · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.