The record
“The following development impact fees are hereby established and imposed on the issuance of all building permits for development within the city to finance the cost of the following categories of public facilities and improvements required by new development. The development impact fees consist of the following fees that are hereby established: ... (G) Storm drainage. A development impact fee is hereby established for storm drainage that includes components for pipelines, basins, pump stations and a master plan.”
“CITY OF TULARE — Fund 301 - Storm Drainage Facilities — Expenditure Summary — Project / Total Cost / Percent Project Funds from DIF: Outlet Mall Storm Drain Basin 2,110,800.57 100.00%; Storm Drain Master Plan 192,092.47 100.00%; Ametijan Storm Drain 264,028.59 100.00%; Ponding Basin - California Estates 1,626.30 85.00%; Terrace Park Pond 265,796.86 40.00%; Storm Drain - Leland/Horizon 294,041.00 100.00%; Cartmill Commons 406,649.30 100.00%”
“The following development impact fees are hereby established and imposed on the issuance of all building permits for development within the city to finance the cost of the following categories of public facilities and improvements required by new development.”
2019-12-17
“§ 8.56.030 Establishment of development fees and providing for their adoption by resolution. ... (G) Storm drainage. A development impact fee is hereby established for storm drainage that includes components for pipelines, basins, pump stations and a master plan. ... (Ord. 19-08, passed 12-17-2019)”
Ordinance No. 19-08
“§ 8.56.030 Establishment of development fees and providing for their adoption by resolution. ... (G) Storm drainage. A development impact fee is hereby established for storm drainage that includes components for pipelines, basins, pump stations and a master plan. ... (Ord. 19-08, passed 12-17-2019)”
at building permit
“The fees established pursuant to this chapter shall be paid for the property on which a development project is proposed at the time of the issuance of any required building permit, except as otherwise provided below.”
“(B) The following shall be exempted from payment of the development impact fees of this chapter: (1) Alterations or renovations of an existing building or structure where no additional dwelling units are created, water meter size is not increased, and/or the use is not changed; and (2) The replacement of a destroyed or partially destroyed or damaged building or structure with a new building or structure of the same size and use. (3) Effective January 1, 2020, accessory dwelling units are subject to the fee exemptions and/or fee restrictions provided for within Cal. Gov't Code § 65852.2.”
“(A) New development that, through demolition or conversion, will eliminate existing development is entitled to a fee credit if the existing development is a lawful use under the Zoning Ordinance, including a nonconforming use. ... (C) Credit for the eliminated development or development that was partially or totally destroyed (as above specified) shall be calculated by the City Engineer in accordance with the fee schedule set forth in the resolution adopted pursuant to § 8.56.030 of this chapter and shall be applied to new development on the same site.”
Every published rate
Every rate below applies to single-family detached.
| Density | Basis | Effective | Amount |
|---|---|---|---|
| Low Density Residential, 3.1-7.0 du/acre (assumes Low Density)this home | per acre | 17 Jan 2020 | $1,796 |
City of Tulare - Engineering Services Department, Development Impact Fee Schedule, Single-Family Detached Residential, "DIF Table 2020, effective 01/17/20", page 1; the "Density Category" block, both per-acre columns · source document ↗
| |||