Water Capacity Charge

Levied by City of San Diego Public Utilities Department on new development in San Diego. Collected other: at construction permit issuance, or when the water meter is requested, whichever comes first (the Code states it is due when building permit fees or connection fees are paid).

What one house pays

$3,047

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of San Diego's total
5%
Total one-time fees here
$56,428
Adjustment
Adjusts only when the board sets a new amount
what the document says

by resolution - no index, no scheduled adjustment

The record

Why it exists

“A capacity charge is collected when a property needs additional water or sewer flow.”

City of San Diego Public Utilities Department, "SCHEDULE FOR Water and Sewer Fees", Information Bulletin, December 2021, s. I "CAPACITY FEES", page 1 · source document ↗
What it pays for

“The fee pays for the property's fair share of major facilities and treatment plants. Water and sewer capacity charges are calculated by Equivalent Dwelling Unit (EDU).”

Information Bulletin "SCHEDULE FOR Water and Sewer Fees", December 2021, s. I "CAPACITY FEES", page 1 · source document ↗
Where it applies

“The following is a list of fees for permitting water services and sewer laterals, and water and sewer capacity charges including potable and recycled water for the City of San Diego.”

Information Bulletin "SCHEDULE FOR Water and Sewer Fees", December 2021, opening paragraph, page 1 · source document ↗
When it was adopted

“(Renumbered from Sec. 67.72 on 7-31-2000 by O-18828 N.S.) (Retitled from "Capacity Charge" to "Water Capacity Charge" and amended 11-20-2019 by O-21155 N.S.; effective 12-20-2019.)”

San Diego Municipal Code, Ch. 6 Art. 7 Division 5 "Water Rates and Charges", code page footer dated (12-2019), s.67.0513 history note, page 5 · source document ↗
Who adopted it

Ordinance O-21155 N.S. (amending SDMC s.67.0513); Division 5 added by Ordinance O-18828 N.S.

“(Renumbered from Sec. 67.72 on 7-31-2000 by O-18828 N.S.) (Retitled from "Capacity Charge" to "Water Capacity Charge" and amended 11-20-2019 by O-21155 N.S.; effective 12-20-2019.)”

San Diego Municipal Code, Ch. 6 Art. 7 Division 5 "Water Rates and Charges", code page footer dated (12-2019), s.67.0513 history note, page 5 · source document ↗
When it is paid

“The water capacity charge shall be due and payable at the time the building permit fees or connection fees are paid, or if a building permit is not required, at the time the water connection fees must be paid, unless otherwise provided by a resolution of the City Council. In any case, this water capacity charge must be paid before the water use (flow) increase is accomplished, unless otherwise provided for by a resolution of the City Council.”

San Diego Municipal Code s.67.0513 "Water Capacity Charge", code page (12-2019), page 5 · source document ↗
Who collects it

City of San Diego Public Utilities Department, the agency that levies it

“All water and sewer costs associated with construction will be collected at the time of construction permit issuance, or when the water meter is requested, whichever comes first. All water meters and taps into public water mains must be installed by the City's Public Utilities Department.”

Information Bulletin "SCHEDULE FOR Water and Sewer Fees", December 2021, second introductory paragraph, page 1 · source document ↗
Who is exempt

“Notwithstanding anything contained in this section, no minimum capacity charge shall be required with respect to a request for the addition of any equivalent family unit or units when a building permit application for such addition was filed with the City prior to March 19, 1974.”

San Diego Municipal Code s.67.0513 "Water Capacity Charge", code page (12-2019), page 5 · source document ↗
Credits and offsets

“In certain areas developers have agreed to install public water and/or sewer facilities to serve future development of other properties. Where an arrangement is made, the City will collect the costs of these improvements from benefitting builders on behalf of the developer. Reimbursement fees are due at the time the water meter and/or sewer connection fees are paid and/or when water and sewer capacity fees are due.”

Information Bulletin "SCHEDULE FOR Water and Sewer Fees", December 2021, s. VI "REIMBURSEMENT FEES", page 3 · source document ↗

Every published rate

Every rate below applies to single-family detached.

RateBasisEffectiveAmount
this home per EDU 1 Jul 2007 $3,047

“Water Capacity Charge (per EDU)........... $3,047 - Effective: July 1, 2007”

City of San Diego Public Utilities Department, "SCHEDULE FOR Water and Sewer Fees", Information Bulletin, December 2021, s. I "CAPACITY FEES", page 1 · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.