DevFeeFinder
Sewer - treatmentSet by connection chargeCitation San Diego Municipal Code s.64.0410

Sewer Capacity Charge

Levied by City of San Diego Public Utilities Department on new development in San Diego. Collected at building permit.

What one house pays

$5,154

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of San Diego's total
9%
Total one-time fees here
$56,428
Adjustment
Adjusts only when the board sets a new amount
what the document says

by resolution - no index, no scheduled adjustment

The record

Why it exists

“A capacity charge is collected when a property needs additional water or sewer flow. The fee pays for the property's fair share of major facilities and treatment plants. Water and sewer capacity charges are calculated by Equivalent Dwelling Unit (EDU).”

"SCHEDULE FOR Water and Sewer Fees", Information Bulletin, City of San Diego Public Utilities Department, December 2021, s. I. CAPACITY FEES, p. 1 · source document ↗
What it pays for

“The valuation of the wastewater system's backbone assets includes treatment plants, pump stations, trunk sewers and collection system pipelines. Existing wastewater assets were valued using the Engineering News Records Construction Cost Index (ENR-CCI) based on 2019 index. Excluded from the asset valuation were non-backbone infrastructure facilities such as equipment, computers, and vehicles. Growth- related wastewater capital improvement projects were included in the total system value.”

Wastewater Financial Plan, Cost of Service, and Rate Study, Final Report, March 23, 2021, "Proposed Wastewater Capacity Fee — SYSTEM VALUATION", p. 49 · source document ↗
Where it applies

“PROJECT NAME: SEWER CAPACITY CHARGES FEE SCHEDULE ADJUSTMENT / COMMUNITY PLAN AREA: CITYWIDE / COUNCIL DISTRICT: CITYWIDE”

Notice of City Council Public Hearing, meeting of Tuesday, September 21, 2021; Date of Notice 09/07/2021, 09/14/2021, p. 1 · source document ↗
When it is paid

at building permit

“This charge shall be due and payable, unless otherwise provided for by a resolution of the City Council, at the time the building permit fees are paid, or if a building permit is not required, at the time the sewer connection fees must be paid.”

San Diego Municipal Code, Chapter 6, Article 4, Division 4, s. 64.0410 "Sewer Capacity Charge", codification dated 12-2019, p. 7 · source document ↗
Who collects it

City of San Diego Public Utilities Department, the agency that levies it

“All water and sewer costs associated with construction will be collected at the time of construction permit issuance, or when the water meter is requested, whichever comes first. All water meters and taps into public water mains must be installed by the City's Public Utilities Department.”

"SCHEDULE FOR Water and Sewer Fees", Information Bulletin, City of San Diego Public Utilities Department, December 2021, introductory text, p. 1 · source document ↗
Who is exempt

“Sewer capacity is not collected on irrigation meters. The water capacity charge is based on meter size, as follows:”

"SCHEDULE FOR Water and Sewer Fees", Information Bulletin, City of San Diego Public Utilities Department, December 2021, s. I.E "Oversized Meters and Irrigation Meters", p. 2 · source document ↗
Credits and offsets

“In certain areas developers have agreed to install public water and/or sewer facilities to serve future development of other properties. Where an arrangement is made, the City will collect the costs of these improvements from benefitting builders on behalf of the developer. Reimbursement fees are due at the time the water meter and/or sewer connection fees are paid and/or when water and sewer capacity fees are due.”

"SCHEDULE FOR Water and Sewer Fees", Information Bulletin, City of San Diego Public Utilities Department, December 2021, s. VI. REIMBURSEMENT FEES, p. 3 · source document ↗

Every published rate

Every rate below applies to single-family detached.

RateBasisEffectiveAmount
this home per EDU 1 Jan 2022 $5,154

“Sewer Capacity Charge (per EDU)........... $5,154 - Effective: Jan. 1, 2022”

"SCHEDULE FOR Water and Sewer Fees", Information Bulletin, City of San Diego Public Utilities Department, December 2021, s. I. CAPACITY FEES, p. 1 · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.