“The City of Roseville (City) collects water connection fees as part of the permitting process for new water connections. These fees are used to fund expansion of water supplies, supply reliability and related infrastructure to service new connections. The city periodically reviews its water connection fees to ensure they are appropriately aligned with current growth projections and will provide adequate funding levels to meet expanding water utility supply and infrastructure needs.”
“Water Distribution Projects. Projects that allow the City to efficiently distribute water throughout its service area and primarily include planning, design and construction of new pipelines and pumping stations. • Water Production Projects. Projects that allow the City to continue to efficiently and effectively treat raw water supplies to levels that meet federal and state clean water standards, including treatment facilities, on-site pipelines and in some instances, pumping stations required to pump water to the distribution system… • Water Storage Projects. Projects that will allow the City to store treated water in various places throughout the water utility system's service area to meet operational, fire flow and emergency needs. • Water Resources. Projects dedicated to the new development of water supply projects and other generally required studies.”
“Water Connection Fee: Assessed on each new water service connection within the City limits, and collected prior to permit issuance. Calculation: Number of units x fee from Table 2 / Table 2 Use-Density | Fee per Unit — Low Density Residential $13,069.00 — Medium Density Residential $7,842.00 — High Density Residential $5,226.00”
at building permit
“Water Connection Fee: Assessed on each new water service connection within the City limits, and collected prior to permit issuance.”
City of Roseville (Environmental Utilities Department — municipal water utility), the agency that levies it
“Environmental Utilities Department……(916) 774-5752 / Water and Sewer Connections & Service”
“C. No additional water connection fee shall be charged for facilities located within a multifamily dwelling complex that are appurtenant to the general function of the multifamily dwelling complex. Such facilities include, but shall not be limited to, community centers, recreational centers, rental offices, maintenance offices and fire systems. D. Pursuant to the fee policy identified in Roseville Municipal Code Section 19.60.100, no water connection fee shall be charged for accessory dwelling units developed within existing structures.”
“Fee Deferral Admin Fee: Assessed on all records for which an approved Impact or Connection Fee Deferral request is processed. The Development Impact Fee Deferral Program was established to encourage development. This program is overseen by both the Economic Development Dept. and the Development Services Dept. Only city-controlled development impact fees may be approved for deferral. All fees not controlled by the city will be due for payment at time of permit issuance.”
“Connection fees are adjusted annually on July 1st of each year by the higher of 3% or the Engineering News Record - Construction Cost Index.”
Every published rate
Every rate below applies to single-family detached.
| Rate | Basis | Effective | Amount |
|---|---|---|---|
| Low density | |||
| this home | per DUE | 1 Jul 2026 | $13,069 |