DevFeeFinder
TransportationSet by city fee ordinanceCitation Ch. 16.84

Traffic Mitigation Fee (growth area)

Levied by City of Rancho Cordova on new development in Rancho Cordova. Authorized under the Mitigation Fee Act - Gov. Code Sec. 66000 et seq. Collected at building permit | other: calculated at subdivision map approval; paid at building permit, temporary certificate of occupancy, certificate of occupancy or final inspection "as applicable".

What one house pays

$21,564

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of Rancho Cordova's total
23%
Total one-time fees here
$94,316
Adjustment
Adjusts yearly · ENR construction cost index · January
what the document says

annual, each January 1, by the increase in the 20-City Construction Cost Index as reported in Engineering News Record for the twelve-month period ending OCTOBER of the prior year (fee booklet footnote [2]; RCMC 16.84.130 independently requires the adjustment "each year no later than January 15th"). *** ONE SENTENCE ANSWERS BOTH HALVES HERE - the measurement window (October) and the adjustment month (January) are different months and both are stated, so escalation_month is safe to write. ***

Next expected change
1 Jan 2027

The record

Why it exists

“The general plan of the city of Rancho Cordova requires that areas chosen for urban expansion shall be capable of being provided, within a reasonable period of time, with an adequate level of public facilities including, but not limited to, roadway facilities and transit facilities." / "The general plan further requires the preparation of a plan that identifies a mechanism for financing those facilities necessary to serve urban development in areas designated for urban expansion.”

RCMC § 16.84.010 Purpose · source document ↗
What it pays for

“All amounts collected from transportation impact fees from Area 1 and Area 2 pursuant to this chapter shall be placed in said fund and shall be expended by the city of Rancho Cordova or its successor agency solely to pay the costs identified in the transportation capital improvement plan and/or development impact fee program and nexus study.”

RCMC § 16.84.030/.040, transportation fund · source document ↗
Where it applies

“The City requires new development to fund bike grade-separations in the City's Growth Area (east of Sunrise Boulevard). As such, the full cost of the 24 grade separations located in the City's Growth Area would be included in the TDIF Program. The nexus-based allocation of the total cost to construct bike grade-separations in the City's Infill Area (west of Sunrise Boulevard), plus the citywide bike trails in the CIP, is based on the estimated growth in DUEs”

Transportation Development Impact Fee Program Nexus Study Update, DKS Associates, December 2021 FINAL, s. 5.3 Bikeway Improvements, printed p. 26 - the study RCMC 16.84.080(B) incorporates by reference · source document ↗
When it was adopted

2005

“(Ord. 24-2005 §3; Ord. 33-2005 §3; Ord. 6-2006 §3; Ord. 3-2013 §1; Ord. 11-2023 §3 (Exh. A))”

Rancho Cordova Municipal Code Ch. 16.84, Development Impact Fees (Transportation Facilities), history note at end of § 16.84.010 and § 16.84.080 · source document ↗
Who adopted it

Ordinance No. 24-2005 (chapter later amended by Ords. 33-2005, 6-2006, 3-2013, 11-2023, 7-2025; prior legislation 2003)

“(Ord. 24-2005 §3; Ord. 33-2005 §3; Ord. 6-2006 §3; Ord. 3-2013 §1; Ord. 11-2023 §3 (Exh. A))”

Rancho Cordova Municipal Code Ch. 16.84, Development Impact Fees (Transportation Facilities), history note at end of § 16.84.010 and § 16.84.080 · source document ↗
When it is paid

“The fees shall be calculated upon the approval of subdivision maps and shall be paid upon issuance of building permits or final inspections, as applicable." / "For projects that are subject to building permits, but not subdivision map approval, the fees shall be both calculated and paid upon issuance of the building permits, temporary certificate of occupancy, or certificate of occupancy, as applicable.”

RCMC § 16.84.060 · source document ↗
Who collects it

City of Rancho Cordova, the agency that levies it

“No building permit, temporary certificate of occupancy, certificate of occupancy, or final inspection, as applicable, shall be approved for property within the city of Rancho Cordova unless the development fees for that property are paid as required by this chapter.”

RCMC § 16.84.050 · source document ↗
Credits and offsets

“Upon application by the property owner or his authorized agent, the director may authorize the construction of any transportation facilities, or portions thereof, in order of priority as designated on the priority list for the transportation development impact fee program in lieu of all, or a portion of, the transportation impact fee required by this chapter.”

RCMC § 16.84.110 Credit for Construction of Transportation Facilities · source document ↗

Every published rate

Every rate below applies to single-family detached.

RateBasisEffectiveAmount
this home per DU 1 Jan 2026 $21,564

“Citywide Transportation Development Impact Fee | Area 1* [1,2] | Area 2* [2,3] | Single Family Detached, > 1,200 SF[4] per Unit | $13,052.90 | $21,564.15 | *Includes 3.75% Admin Fee”

City of Rancho Cordova, "Development Related Processes and Fees", LAST UPDATED July 2026, p. 3-3 (Citywide Transportation Development Impact Fee); the Area 1 / Area 2 map is p. 3-4 · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.