School Facilities Fee (Level 1) - Placerville Union SD + El Dorado Union HSD (combined)

Levied by School districts — Placerville Union SD + El Dorado Union HSD. The City's own schedule names the line only as "School District" and refers the amount out: "Determined by the Office of Education (530-295-2202)" on new development in Placerville. Authorized under the Ed. Code Sec. 17620; Gov. Code Sec. 65995 et seq. (statutory school facilities fee). Collected at building permit.

What one house pays

$10,340

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of Placerville's total
14%
Total one-time fees here
$71,551
Adjustment
Adjusts yearly · another named index
what the document says

by determination of the El Dorado County Office of Education — no index, formula or annual adjustment date is named in any document read

Next expected change
1 Jul 2027 rate on file is stale
!

A scheduled adjustment has passed since this rate took effect

This fee escalates annually. The rate on file is effective 17 May 2024, and at least one adjustment has fallen due since. The current amount is probably different, and for an indexed fee almost certainly higher. The next change after that is expected 1 Jul 2027.

The figure is published as held rather than projected forward, because a number computed from an index is not a number quoted from an adopted schedule. It is flagged so you can check the agency's current schedule before relying on it.

The record

Why it exists

“On January 1, 1987, AB 2926 enacted Government Code sections 65995 and 53080, which authorizes school districts to levy a developer fee on new construction, for the purpose of paying their required share of school building construction.”

EDCOE, "Developer Fees", undated, intro paragraph · source document ↗
What it pays for

“Some of the fees shown are sometimes referred to as impact fees and are collected to pay your project's fair share of the City's infrastructure needed to service your construction project which includes; transportation improvement, water system capacity improvements, sewer collection and treatment system capacity, fire suppression, new and improved parks and new or expanded schools.”

City of Placerville, "SINGLE FAMILY DWELLING APPLICATION PACKET", EFFECTIVE October 7, 2022, p.2, "Single Family Dwelling (SFD) Construction Permit" · source document ↗
Where it applies

“Residential Fees for New Construction | School District Name | Fee Per S. F. of Dwelling Area | ... | Placerville | $5.17”

EDCOE, "Developer Fees", undated, residential fee table; the fee area is the school district, not the city · source document ↗
When it is paid

at building permit

“It is collected as a separate check at the time of permit issuance.”

City of Placerville, "SINGLE FAMILY DWELLING APPLICATION PACKET", effective 2022-10-07, revision 12/12/2022, p.8, School District Fee box · source document ↗
Who collects it

“The El Dorado County Office of Education collects a developer fee per Government Code Section 66997(b). Note that the fee is determined by the EDCOE prior to issuance of the permit. It is collected as a separate check at the time of permit issuance. Any fee increase may apply during the permit application process. The County Office of Education should be contacted directly with any questions.”

City of Placerville, "SINGLE FAMILY DWELLING APPLICATION PACKET", effective 2022-10-07, revision 12/12/2022, p.8 · source document ↗
Who is exempt

“Additions - under 500 s.f. that are attached to an existing dwelling will not be assessed a school fee.”

EDCOE, "Developer Fees", undated, text below the residential fee table · source document ↗

Every published rate

Every rate below applies to residential.

RateBasisEffectiveAmount
Placerville
this home per sq ft 17 May 2024 $5.17

“School District | Fee | Determined by the Office of Education (530-295-2202) | Fees charged for sf ≥ 500 sf | Residential | $5.17 sf”

City of Placerville Development Fees / Joint Fee Schedule, Updated 04/16/25 DWH, BUILDING DIVISION, p.1 of 7; page footer "Effective 07/09/08; Updates: Engineering 03/25/17, 3/11/19, 3/27/24; Building 7/1/14; Planning 12/07/23, School 5/17/24" · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.