DevFeeFinder
Sewer - treatmentSet by connection charge

Root Creek WD wastewater connection fee

Levied by Root Creek Water District on new development in Madera County (unincorporated). Authorized under the Gov. Code Sec. 66013 (capacity charge for water or sewer service). Collected at building permit — see caveat in notes; no adopting resolution or district policy quoted below states the trigger in binding terms.

What one house pays

$13,607

This fee is not in Madera County (unincorporated)'s published figure. This site publishes a home outside any plan area, and this charge applies only in Riverstone. The amount shown is what it costs a house that is there.

Total one-time fees here
$39,700
Adjustment
Adjusts ENR construction cost index
what the document says

ENR indexed

The record

Why it exists

“The wastewater connection fee recovers the construction cost of the wastewater system plus financing costs over a 15-year term at 3% interest.”

2021 Connection Fee Update Report, October 14, 2021, Section 4: Wastewater Connection Fee, p.14 · source document ↗
What it pays for

“Table 12: Wastewater System Construction Cost — Collection System: Sewer Backbone $8,012,500; 12" line to RCWD $689,000; Pump Station Village C $2,000,000 … Treatment: Initial WWTP (65,000 gpd) $7,598,100; Expansion from 65,000 to 130,000 gpd $1,841,000; Initial 400K gpd $10,000,000; Expansion to 600k $4,200,000; Expansion from 600k gpd to 1.2 MGD $47,100,000; Retrofit Bioreactor with Membranes $10,000,000; Stormwater control at WWTP site $200,000; WWTP design, legal, and environmental $3,870,600; Reclaimed water system $1,600,000 … Land: Initial WWTP site $1,573,700; Initial WWTP ponds $806,000; Village C WWTP site $161,500 … Wastewater Capacity Fee ($/EDU) $19,508”

2026 Capacity Fee Update, Table 12, p.15 · source document ↗
Where it applies

“The Riverstone/Root Creek Water District system (the "System") is a community water system that serves the Riverstone Development (the "Development"). The Development is located in Madera County, near the intersection of California State Highway 41 and Avenue 12. … The Development and System are located within Root Creek Water District (the "District"), an independent special district consisting of approximately 9,500 acres of primarily agricultural lands.”

Utility Service Policy Manual, March 9, 2020, Section 1: Concept of Utility Service, p.1 · source document ↗
When it was adopted

2024-11-18 (rate currently in effect; effective 2025-01-01)

“The public hearing was called to order at 11:03 a.m. There was no public comment. A motion was made by Director Coulthard, seconded by Director DelaGueera to adopt resolution to established fees for the 2025 calendar year. The public hearing closed at 11:04 a.m.”

Minutes of the Special Meeting of the Board of Directors, Root Creek Water District, November 18, 2024, item 6 "Public Hearing"; sic throughout · source document ↗
Who adopted it

“The public hearing was called to order at 11:03 a.m. There was no public comment. A motion was made by Director Coulthard, seconded by Director DelaGueera to adopt resolution to established fees for the 2025 calendar year. The public hearing closed at 11:04 a.m.”

Minutes of the Special Meeting of the Board of Directors, Root Creek Water District, November 18, 2024, item 6 "Public Hearing"; sic throughout · source document ↗
When it is paid

“Typically, connection fees are charged to new development as permits are issued for construction.”

2021 Connection Fee Update Report, Section 4, p.17 · source document ↗
Who collects it

Root Creek Water District, the agency that levies it

“The Permittee shall pay current applicable fees and deposits required by the District upon demand. District staff should be consulted for current and applicable fees.”

Infrastructure Facilities Policy, revised October 13, 2025, "Requirements for both Primary and Secondary Facilities", item 10, p.4 · source document ↗
Credits and offsets

“Backbone Facilities funded by a Permittee's advanced funds or constructed by the Permittee at prevailing wages (as required by law) are fee creditable as building permits are issued. If fee credits do not fully reimburse the Permittee's advancement, the District will reimburse the Permittee as building permits are issued within the District.”

Infrastructure Facilities Policy, adopted September 20, 2017, revised October 13, 2025, "Infrastructure Dedication Requirements", item 1, p.3 · source document ↗
How it changes

“Phase-in — To provide affordability it is suggested that the proposed fees be phased-in as shown in Table 26." followed by "Table 26: Proposed Phase-in of Residential Connection Fees … Year / Wastewater: 2021 Current $11,684; 2022 $12,451; 2023 $13,217; Thereafter + annual inflationary cost increases”

2021 Connection Fee Update Report, Section 6, p.27 · source document ↗

Every published rate

Every rate below applies to single-family detached.

RateBasisEffectiveAmount
Riverstone
per EDU 1 Jan 2025 $13,607

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.