DevFeeFinder
WaterSet by connection charge

Water Capacity Fee

Levied by City of Fresno, Department of Public Utilities on new development in Fresno. Authorized under the Gov. Code Sec. 66013 (capacity charge for water or sewer service). Collected other: on connection to the City water system — the charge attaches to the water service connection, and FMC 6-507(a) conditions the connection permit on payment of the charges designated in the Master Fee Resolution. The fee schedule assigns NO payment-timing footnote to this line.

What one house pays

$3,553

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of Fresno's total
10%
Total one-time fees here
$35,170
Adjustment
Adjusts yearly · ENR construction cost index
what the document says

annual, ENR 20-City Construction Cost Index for the 12 months ending in May, each July 1, beginning 2018-07-01

Next expected change
1 Jul 2027

The record

Why it exists

“to repeal various fees associated with providing water capacity for new and expanded connections to the water system and create a new Water Capacity Fee classification, and to adopt Water Capacity Fees as proposed by and justified in the nexus study prepared by Bartle Wells Associates.”

City of Fresno Legistar matter index, File ID17-554, 2017 · source document ↗
Where it applies

“A water capacity fee shall be required for all water service connections to the City water system, except for connections solely for fire protection.”

Fresno Municipal Code s. 6-507(a)(9), "PERMIT TO CONNECT WATER REQUIRED: PAYMENT OF CHARGES" · source document ↗
When it was adopted

2017-04-13

“ADOPTED" / "The above item was approved on the Consent Calendar with Councilmember Bredefeld voting "no."" / "Pass" / "2017-04-13T13:30:00”

City of Fresno Legistar, matter 5333 history record · source document ↗
Who adopted it

“ADOPTED" / "The above item was approved on the Consent Calendar with Councilmember Bredefeld voting "no."" / "Pass" / "2017-04-13T13:30:00”

City of Fresno Legistar, matter 5333 history record · source document ↗
When it is paid

“A water capacity fee shall be required for all water service connections to the City water system, except for connections solely for fire protection. The amount of the fee for each water service shall be determined by meter size as designated in the Master Fee Resolution.”

Fresno Municipal Code s. 6-507(a)(9) · source document ↗
Who collects it

City of Fresno, Department of Public Utilities, the agency that levies it

“CITY OF FRESNO MASTER FEE SCHEDULE / PUBLIC UTILITIES DEPARTMENT / WATER CONNECTION CHARGES (FMC 6-507)”

Master Fee Schedule, Public Utilities Department, MFS Amendment #590 (January 2026), page 164, section heading · source document ↗
Who is exempt

“A water capacity fee shall be required for all water service connections to the City water system, except for connections solely for fire protection.”

Fresno Municipal Code s. 6-507(a)(9) · source document ↗
Credits and offsets

“If the use of a property, lot, parcel, or premise changes, and a larger service connection and meter are required to serve the new uses on the property, the water capacity fee obligation shall be based upon the incremental difference in cost between the water capacity fee charge for the larger meter size and the water capacity fee charge for the existing meter size, or the existing meter size may be estimated based upon the 10-year historical average water use on the property, whichever is less. No water capacity fee credit will be owed by the City when the new meter size is smaller than the prior meter size or the estimated meter size.”

Fresno Municipal Code s. 6-507(a)(9) · source document ↗
How it changes

“** 530th Master Fee Schedule Amendment effective upon effective date of the Water Capacity Charge Ordinance.”

Master Fee Schedule, Public Utilities Department, MFS Amendment #590 (January 2026), page 164, footnote ** to "Water Capacity Fee" · source document ↗

Every published rate

Every rate below applies to single-family detached.

Applies toBasisEffectiveAmount
—
3/4" meterthis home per connection 1 Jul 2026 $3,553

“Water Capacity Fee^ | Meter Size* | Up to 3/4 3,552.77”

FY 2023 City of Fresno Development Impact Charge & Fee Summary, page 2, "WATER CONNECTION CHARGES", item j, parenthesised "(Core Areas/Infill)" column · source document ↗
Core Areas/Infill
3/4" meter per connection 1 Jul 2018 $1,776
the line this rate was read from

“j. Water Capacity Fee (Core Areas/Infill) / - Up to ¾" Meter Size $3,551/each (1,775.50/each)”

FY 2023 City of Fresno Development Impact Charge & Fee Summary, page 2, "WATER CONNECTION CHARGES", item j, parenthesised "(Core Areas/Infill)" column · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.

↑↓ navigate↵ openesc close