Dublin San Ramon Services District water capacity reserve fee

Levied by Dublin San Ramon Services District on new development in Dublin. Authorized under the Gov. Code Sec. 66013 where the charge is for water or sewer capacity; otherwise the district's own enabling act (Health & Safety Code / Pub. Resources Code, by district type). Collected other: within 30 calendar days before installation of a new or larger water meter — not at building permit.

What one house pays

$16,501

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of Dublin's total
11%
Total one-time fees here
$147,738
Adjustment
Not recorded

The record

Why it exists

“The capacity reserve fees are a contribution of capital in order to reimburse existing customers for the immediately available capacity in the existing system, and to help finance future growth-related capacity improvements needed to serve them. Absent those fees, many utilities would likely be unwilling to build growth-related facilities (i.e., burden existing rate payers with the entire cost of growth-related capacity expansion).”

DSRSD Water Capacity Reserve Fee, Final Report, HDR Engineering, April 2022, §1.2 "Defining Water Capacity Reserve Fees", p. 5 · source document ↗
What it pays for

“Dublin San Ramon Services District charges a capacity reserve fee on all new development and all expansions or changes of existing development to pay for current and future capital improvement projects in the wastewater treatment plant, wastewater collection system, and water system. These fees are designed to cover the cost of building expanded facilities for new development, including debt service for assets built to serve new development.”

DSRSD Annual Capacity Reserve Fee Report, Fiscal Year Ending June 30, 2025, "Definitions", p. 1 · source document ↗
Where it applies

“The District is the water retailer for residents in the City of Dublin and the Dougherty Valley portion of the City of San Ramon.”

April 2022 study, §3.2 "Overview of District's Water System", p. 10 · source document ↗
When it is paid

other: within 30 calendar days before installation of a new or larger water meter — not at building permit

“Water capacity charges and Zone 7 Water connection fees shall be paid within 30 calendar days before installation of a new or larger water meter.”

DSRSD, "City of Dublin Water & Wastewater Capacity Reserve Fees", Zone 7 Water Connection Fees section, undated page · source document ↗
Who collects it

“Zone 7 functions as DSRSD's water wholesaler. Per agreement, DSRSD collects Zone 7's water capacity reserve fees for the agency.”

DSRSD Permit Counter FAQs, undated · source document ↗
Credits and offsets

“Contributed assets are developer contributed assets which were not included in the water capacity reserve fee calculation. In contrast to this, non-contributed assets were included at 100 percent (%) eligible.”

April 2022 study, §3.6.1 "Buy-In Component", p. 14 · source document ↗
How it changes

“DSRSD fees are revised annually on July 1 based on changes in the Engineering News Record (ENR) Construction Cost Index and are subject to change at other times”

April 2022 study, Table 3-1 footnote [3], p. 11; identical footnote at Table ES-1, p. 3 · source document ↗

Every published rate

Every rate below applies to single-family detached.

ComponentBasisEffectiveAmount
5/8" iPerl @ 10 gpm per connection — $15,722
5/8" meter assembly per meter — $779.00

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.