TransportationSet by DIF ordinanceCitation Clovis Municipal Code Chapter 7.7 (Major Street Development), sections 7.7.02-7.7.03

Street fees by service area (travel lane, signals, bridges)

Levied by City of Clovis on new development in Clovis. Authorized under the Mitigation Fee Act - Gov. Code Sec. 66000 et seq. Collected other: due upon approval of a final tract map, a final parcel map, or a building permit — whichever occurs, with deferral to building permit on security.

What one house pays

$11,908

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot — this fee varies by zone and the row that applies, so see the full schedule below.

Share of Clovis's total
22%
Total one-time fees here
$55,182
Adjustment
Adjusts yearly · ENR construction cost index
what the document says

annual, Engineering News Record index for California Cities (12 months preceding December) or actual construction costs; rates themselves set by City Council resolution

Next expected change
1 Jul 2027 rate on file is stale
!

A scheduled adjustment has passed since this rate took effect

This fee escalates annually. The rate on file is effective 21 Jul 2025, and at least one adjustment has fallen due since. The current amount is probably different, and for an indexed fee almost certainly higher. The next change after that is expected 1 Jul 2027.

The figure is published as held rather than projected forward, because a number computed from an index is not a number quoted from an adopted schedule. It is flagged so you can check the agency's current schedule before relying on it.

The record

Why it exists

“To establish a financing mechanism for major streets which creates as reasonably equitable a system of distribution of costs based upon burdens imposed, benefits received and/or timing of land development as can be achieved under the existing circumstances”

CMC s. 7.7.01, Major street development, objective (b) · source document ↗
What it pays for

“Major Street Fees: The Street fees include fees for center travel lane improvements, outside travel lane improvements, construction of bridges, construction of traffic signals, under-grounding of utilities, quad intersections, and administration. The fees are specific to certain areas within the City based on the infrastructure requirements and development characteristics of the areas.”

Report to the City Council, Finance Department, January 16, 2024, "Status Report of Development Fee Funds for the fiscal year ended June 30, 2023", item 10 · source document ↗
Where it applies

“'Service areas' shall mean those certain areas of the City that are designated as areas of burden and/or benefit for the collection, distribution, and use of related major street development fees. Service Area 1 shall consist of all properties within the corporate limits and/or the City's adopted sphere of influence located north of the centerline of Herndon Avenue, east of the centerline of Willow Avenue, and south of the centerline of Shepherd Avenue. Service Area 2 shall consist of all properties within the City's corporate limits and/or the City's adopted sphere of influence located north of the centerline of the Gould Canal, east of the centerline of Fowler Avenue, south of the centerline of Herndon Avenue, and west of the centerline of Locan Avenue. Service Area 3 shall consist of all properties within the City's corporate limits and/or the City's adopted sphere of influence located north of the City's southerly sphere of influence boundary, west of the centerline of Fowler Avenue, and south of the centerline of Herndon Avenue. Service Area 4 shall consist of all properties within the corporate limits and/or the City's adopted sphere of influence located east of the centerline of Locan Avenue and south of the centerline of Herndon Avenue. Service Area 5 shall consist of all properties within the corporate limits and/or the City's adopted sphere of influence located north of the centerline of Shepherd Avenue.”

CMC s. 7.7.02(aa), Definitions · source document ↗
When it was adopted

1989-09-06

“(§1, Ord. 89-32, eff. September 6, 1989; as amended by §9, Ord. 93-19, eff. August 18, 1993; §1, Ord. 95-14, eff. June 30, 1995; §26, Ord. 04-14, eff. May 5, 2004; §9, Ord. 05-16, eff. July 16, 2005; §11, Ord. 13-13, eff. July 12, 2013)”

Clovis Municipal Code Ch. 7.7 Major Street Development, history note to Ch. 7.7 / s. 7.7.01, current code · source document ↗
Who adopted it

Ordinance No. 89-32 (chapter as amended through Ord. 24-10, eff. 2024-07-31)

“(§1, Ord. 89-32, eff. September 6, 1989; as amended by §9, Ord. 93-19, eff. August 18, 1993; §1, Ord. 95-14, eff. June 30, 1995; §26, Ord. 04-14, eff. May 5, 2004; §9, Ord. 05-16, eff. July 16, 2005; §11, Ord. 13-13, eff. July 12, 2013)”

Clovis Municipal Code Ch. 7.7 Major Street Development, history note to Ch. 7.7 / s. 7.7.01, current code · source document ↗
When it is paid

“The fees set forth in Section 7.7.07 shall be due and payable as a condition precedent to and upon the approval of a final tract map, a final parcel map, or a building permit.”

CMC s. 7.7.08, Payment of fees · source document ↗
Who collects it

City of Clovis, the agency that levies it

“Every owner/developer and every project receiving a development entitlement shall be required, as a condition thereof, to pay the appropriate major street fees, to construct major street improvements, to relocate existing facilities, and to perform other related matters”

CMC s. 7.7.03, Major street development requirements, opening paragraph · source document ↗
Who is exempt

“Any development considered to be public infrastructure shall be exempt from the payment of center travel lane, outside travel lane, traffic signal, bridge, and administrative fees under this section.”

CMC s. 7.7.07(c)(1) · source document ↗
Credits and offsets

“Credit for actual cost incurred for the portion of the right-of-way within ten feet (10') of the face of curb and the frontage improvements (excluding landscaping) shall be granted against the outside travel lane fee, to the extent the actual costs do not exceed the outside travel lane fee. The developer shall be entitled to reimbursement from the relevant outside travel lane fund for the remaining balance of such costs.”

CMC s. 7.7.03(a)(1) · source document ↗

Every published rate

Land useApplies toBasisEffectiveAmount
Service Area 1
Single-family detached this home per DU 21 Jul 2025 $11,908

“Area 1 | SFR - Low Density (2.1 - 4) | per unit | Outside Travel Lane $8,651 | Center Travel Lane $2,239 | Traffic Signals $933 | Bridges $85 | Total $11,908”

Master Development Fee Schedule, effective July 21, 2025, Street Fees, p. 3, Area 1 · source document ↗
Multi-family MFR - Medium High Density (7.1 - 15) per DU — $7,144
the line this rate was read from

“MFR - Medium High Density (7.1 - 15) | per unit | $5,190 | $1,343 | $560 | $51 | $7,144”

the levying document · source document ↗
Multi-family MFR - High (15.1 - 25) per DU — $7,144
the line this rate was read from

“MFR - High (15.1 - 25) | per unit | $5,190 | $1,343 | $560 | $51 | $7,144”

the levying document · source document ↗
Multi-family MFR - Very High (25.1 - 43) per DU — $7,144
the line this rate was read from

“MFR - Very High (25.1 - 43) | per unit | $5,190 | $1,343 | $560 | $51 | $7,144”

the levying document · source document ↗
Service Area 4
Single-family detached per DU 21 Jul 2025 $11,712
the line this rate was read from

“Area 4 | SFR - Low Density (2.1 - 4) | per unit | Outside Travel Lane $7,636 | Center Travel Lane $2,695 | Traffic Signals $635 | Bridges $746 | Total $11,712”

Master Development Fee Schedule, effective July 21, 2025, Street Fees, p. 4, Area 4 · source document ↗
Multi-family MFR - Medium High Density (7.1 - 15) per DU — $7,027
the line this rate was read from

“MFR - Medium High Density (7.1 - 15) | per unit | $4,581 | $1,617 | $381 | $448 | $7,027”

the levying document · source document ↗
Multi-family MFR - High (15.1 - 25) per DU — $7,027
the line this rate was read from

“MFR - High (15.1 - 25) | per unit | $4,581 | $1,617 | $381 | $448 | $7,027”

the levying document · source document ↗
Multi-family MFR - Very High (25.1 - 43) per DU — $7,027
the line this rate was read from

“MFR - Very High (25.1 - 43) | per unit | $4,581 | $1,617 | $381 | $448 | $7,027”

the levying document · source document ↗
Service Area 5
Single-family detached per DU 21 Jul 2025 $6,104
the line this rate was read from

“Area 5 | SFR - Low Density (2.1 - 4) | per unit | Outside Travel Lane $3,606 | Center Travel Lane $1,857 | Traffic Signals $410 | Bridges $231 | Total $6,104”

Master Development Fee Schedule, effective July 21, 2025, Street Fees, p. 4, Area 5 · source document ↗
Multi-family MFR - Medium High Density (7.1 - 15) per DU — $3,662
the line this rate was read from

“MFR - Medium High Density (7.1 - 15) | per unit | $2,163 | $1,114 | $246 | $139 | $3,662”

the levying document · source document ↗
Multi-family MFR - High (15.1 - 25) per DU — $3,662
the line this rate was read from

“MFR - High (15.1 - 25) | per unit | $2,163 | $1,114 | $246 | $139 | $3,662”

the levying document · source document ↗
Multi-family MFR - Very High (25.1 - 43) per DU — $3,662
the line this rate was read from

“MFR - Very High (25.1 - 43) | per unit | $2,163 | $1,114 | $246 | $139 | $3,662”

the levying document · source document ↗
Service Area 2
Single-family detached per DU 21 Jul 2025 $518.00
the line this rate was read from

“Area 2 | SFR - Low Density (2.1 - 4) | per unit | Outside Travel Lane $412 | Center Travel Lane $0 | Traffic Signals $106 | Bridges $0 | Total $518”

Master Development Fee Schedule, effective July 21, 2025, Street Fees, p. 3, Area 2 · source document ↗
Multi-family MFR - Medium High Density (7.1 - 15) per DU — $311.00
the line this rate was read from

“MFR - Medium High Density (7.1 - 15) | per unit | $248 | $0 | $63 | $0 | $311”

the levying document · source document ↗
Multi-family MFR - High (15.1 - 25) per DU — $311.00
the line this rate was read from

“MFR - High (15.1 - 25) | per unit | $248 | $0 | $63 | $0 | $311”

the levying document · source document ↗
Multi-family MFR - Very High (25.1 - 43) per DU — $311.00
the line this rate was read from

“MFR - Very High (25.1 - 43) | per unit | $248 | $0 | $63 | $0 | $311”

the levying document · source document ↗
Service Area 3
Single-family detached per DU 21 Jul 2025 $115.00
the line this rate was read from

“Area 3 | SFR - Low Density (2.1 - 4) | per unit | Outside Travel Lane $77 | Center Travel Lane $0 | Traffic Signals $38 | Bridges $0 | Total $115”

Master Development Fee Schedule, effective July 21, 2025, Street Fees, p. 4, Area 3 · source document ↗
Multi-family MFR - Medium High Density (7.1 - 15) per DU — $70.00
the line this rate was read from

“MFR - Medium High Density (7.1 - 15) | per unit | $47 | $0 | $23 | $0 | $70”

the levying document · source document ↗
Multi-family MFR - High (15.1 - 25) per DU — $70.00
the line this rate was read from

“MFR - High (15.1 - 25) | per unit | $47 | $0 | $23 | $0 | $70”

the levying document · source document ↗
Multi-family MFR - Very High (25.1 - 43) per DU — $70.00
the line this rate was read from

“MFR - Very High (25.1 - 43) | per unit | $47 | $0 | $23 | $0 | $70”

the levying document · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.

↑↓ navigate↵ openesc close